Breda Central Station

Configuration and preparation of information transfer

The Public Transport Terminal Breda Central Station is a complex structure in which a train terminal with shops, offices, bus terminal and residential blocks are united into one inseparable whole. The preparation of a project-specific configuration and the preparation / explanation of the transfer of information to the various asset managers by incertex were necessary to familiarize the project organization with asset information for asset managers and real estate managers.

Demarcation

If real estate, management and costs need to be divided between different parties, clear demarcation drawings and room records are indispensable annexes to the integral property and management agreements. For the Breda Central Station project, we have made the distributions in accordance with the agreements made. This means that floor plans and cross-sections are made suitable for intake by the Land Registry in a clear, timely and neutral way.

Can we help you with a similar need or these activities? Please contact us

  • Project organization: ProRail
  • Asset manager/real estate manager: ProRail, NS Stations, Municipality of Breda
  • Main contractor: Ballast Nedam
  • 595  demarcation drawings of structures drafted
  • 15 facade drawings stiched to a whole overview of vertical demarcations
  • 1 space state drafted
  • 2,100 files saved
  • 94 folders arranged
  • 4.53 GB of data created